the volume, even for bench, with the loading scheme he provided kicked my ass, and even sheiko CMS/MS didnt kill me...
I get a damned divide by zero error in these as soon as I change them.
What are you trying to change? I've not had any problems either with Excel or OpenOffice.
Edit: I take that back. I had to go through and do a replace all for the MROUND to the CEILING. I was getting a #NAME error after I tried to change my maxes. After that it worked fine.
Fuck.
A #NAME in the load column on the second page when I change the max on the first page.
I'll try OO instead.
hmm, I think the MROUND function may have to be installed in separately
CEILING will work just fine though